Control From the Origin
● Fabric Processing ●
1 Fabric Inspection & 2 Fabric Loosening
We check the fabric to see if there being any defects on it. Meanwhile the fabric is loosening for cutting.
3 Fabric Laying
After loosing for 1-2 days, the fabric should be lain on the cutting table for cutting.
4 Cutting
The workers are cutting fabric.
Every detail matters.
Efficient Yet Critical
● Bonding Processing ●
Outgoing Quality Control
We have a dedicated QC department. All of the outgoing products are qualified products that go through strict QC processes.
Packaging & Delivery
Your orders will be randomly inspected to ensure pass rate before delivery.
We assure in-time delivery to the right destination with correct product and quantity.
And the most important thing is, the best quality.